What is happening
You arrive at a builder hoisting mortar to a first-floor scaffold.
The builder cannot lift the bucket without straining. It weighs 360 N, he can pull with 90 N, and the block fitted has the wrong number of supporting ropes.
Load supported
720N
Bucket weight
360N
Load supported is over by 360 N
Equation balance. Supporting ropes at 8 ropes. Load supported 720 N, Bucket weight 360 N. Currently load supported is over by 360 N.
What is happening
You arrive at a builder hoisting mortar to a first-floor scaffold.
The builder cannot lift the bucket without straining. It weighs 360 N, he can pull with 90 N, and the block fitted has the wrong number of supporting ropes.