What is happening
You arrive at a concrete mixer on a bridge repair with one bag of cement left.
The mix is coming out weak. It is specified 3 parts cement to 5 parts sand, there are 12 units of cement in the hopper, and the sand feed is set wrong.
Cement × sand
108units
Required ratio
60units
Bridge scaler. Sand quantity at 36 units. Cement × sand 108 units, Required ratio 60 units. Currently cement × sand is over by 48 units.
What is happening
You arrive at a concrete mixer on a bridge repair with one bag of cement left.
The mix is coming out weak. It is specified 3 parts cement to 5 parts sand, there are 12 units of cement in the hopper, and the sand feed is set wrong.