Work along a rampRunning
Torque rig. Ramp length at 9.6 m. Work done 240 J, Work rated 1500 J. Currently work done is short by 1260 J.TUNINGWORK DONEWORK RATED
t = 0.0s

Work done

240J

Work rated

1500J

9.6 m

Torque rig. Ramp length at 9.6 m. Work done 240 J, Work rated 1500 J. Currently work done is short by 1260 J.

What has to balanceW=F×dW = F \times d

What is happening

You are called to a warehouse costing the energy of hauling a pallet up a loading ramp.

The winch keeps stalling before the top. It pulls the pallet with a steady 25 N, and the job is rated at 1500 J of work for one trip.