Work done liftingRunning
Energy ledger. Well depth at 18.4 m. Work done 828 J, Rated work 405 J. Currently work done is over by 423 J.TUNINGWORK DONERATED WORKTOTAL ENERGY IS FIXED — THE SPLIT IS NOT18.4 M
t = 0.0s

Work done

828J

Rated work

405J

18.4 m

Energy ledger. Well depth at 18.4 m. Work done 828 J, Rated work 405 J. Currently work done is over by 423 J.

What has to balanceW=F×dW = F \times d

What is happening

You arrive at a well in a courtyard where a bucket is hauled by hand.

Nobody has measured how deep the well actually is. The full bucket weighs 45 N, and the rope job is rated at 405 J per haul.