Work done liftingRunning
Energy ledger. Well depth at 18.4 m. Work done 828 J, Rated work 405 J. Currently work done is over by 423 J.TUNING
t = 0.0s

Work done

828J

Rated work

405J

Work done is over by 423 J

18.4 m

Energy ledger. Well depth at 18.4 m. Work done 828 J, Rated work 405 J. Currently work done is over by 423 J.

What has to balanceW=F×dW = F \times d

What is happening

You arrive at a well in a courtyard where a bucket is hauled by hand.

Nobody has measured how deep the well actually is. The full bucket weighs 45 N, and the rope job is rated at 405 J per haul.