What is happening
You are called to a field hospital running on a single generator line.
The ward lights keep browning out. They need 300 W delivered at 2.5 A, and the supply voltage is set too low.
Delivered power
100W
Ward demand
300W
Delivered power is short by 200 W
Current splitter. Supply voltage at 40 V. Delivered power 100 W, Ward demand 300 W. Currently delivered power is short by 200 W.
What is happening
You are called to a field hospital running on a single generator line.
The ward lights keep browning out. They need 300 W delivered at 2.5 A, and the supply voltage is set too low.