Linear equationsRunning
Coordinate navigator. Vehicles on the ramp at 37 vehicles. Total load 148 t, Ramp rating 68 t. Currently total load is over by 80 t.TUNING68VEHICLES ON THE RAMP →↑ TOTAL LOAD
t = 0.0s

Total load

148t

Ramp rating

68t

Total load is over by 80 t

37 vehicles

Coordinate navigator. Vehicles on the ramp at 37 vehicles. Total load 148 t, Ramp rating 68 t. Currently total load is over by 80 t.

What has to balanceax=cax = c

What is happening

You arrive at a ferry loading ramp rated by axle weight.

The ramp is loaded past its certificate. It is rated to exactly 68 tonnes, each vehicle puts 4 tonnes on it, and the vehicle count is wrong.