Live relationshipE+T=PE + T = P
Water cycle loop. Precipitation at 324 mm. Water accounted 664 mm, Catchment total 505 mm. Currently water accounted is over by 159 mm.WATER CYCLE LOOPTUNINGWATER ACCOUNTEDCATCHMENT TOTAL324 MM
t = 0.0s

Water accounted

664mm

Catchment total

505mm

324 mm

Water cycle loop. Precipitation at 324 mm. Water accounted 664 mm, Catchment total 505 mm. Currently water accounted is over by 159 mm.

Narrative feed

You are called to a catchment model that keeps predicting phantom floods.

Evaporation accounts for 340 mm against a 505 mm total. The precipitation figure entered is wrong, so the balance never closes.